Keith's Blog

This is where you will find our latest news/updates

January 8.............Now operational 40-6 meters. On 40 and 30 we are using phased SteppIR Big IR verticals.
January 8.............SW SteppIR #2 vertical will not tune. Currently using NE vertical #1 non-directional.
January 9.............30 meters power set for 100w barefoot, 200w with amp.
January 9.............Charles, KG5BVE, and I will go to the remote to trouble-shoot SW vertical #2.
January 9.............Remote Base User Instruction manual.
January 10............Charles and I spent several hours at the remote today fixing vertical #2. (BAD CABLE)
January 10............Power output set a 1500 watts on 40. 30 meters set at 200 watts.
January 10............Sign up to our groups.io email/news/message center. OLD THINKLOGIC SYSTEM WILL SOON GO AWAY.
January 10............On QSY give the SteppIR verticals a moment or two to autotune to frequency. (AMP WILL MUTE)
January 10............DX Engineering called. Our vertical phased array switcher is repaired. We will get it back next week.
January 10............Our "kittty" is empty and begging to be fed. Please PayPal what you can.
January 15............Phased Array Instruction manual.
January 16............The DX Engineering relay box got here. We are getting ready to install it.
January 17............Project Success. The phased verticals are WORKING WELL on 40 and 30 meters.
January 18............Bob, KC6AWX, has made a donation that will allow us to add 80 and 60 meters, non-directional.

analytics counter